Draw the rack first, not last
Show us the equipment rack and we will tell you who installed the home, and how the next ten years of it will go.

There is a version of the equipment rack that turns up in a lot of houses. It is in a hallway cupboard, because the cupboard was what was left. The gear is stacked rather than mounted. The cables are looped in coils and nothing is labelled. A power board sits on the floor underneath it.
That rack works on handover day. It fails the first time anyone has to add to it, and it fails quietly for years before that, running ten degrees hotter than it should.
The rack is a room, not a cupboard
In a significant home the rack carries the network, the lighting processor, the audio distribution, the cinema, the camera recorder, the door and gate interfaces and the power conditioning. It is the single point every other system runs back through. Treating it as leftover space is the decision that makes everything downstream harder.
Three things decide whether it is a good one, and all three are settled on paper.
Where it sits. Somewhere serviceable, somewhere thermally sensible, and ideally somewhere a technician can reach without walking through a bedroom at seven in the evening. A plant room, a services cupboard, a garage wall. Not under the stairs, and not in the roof space where summer turns it into an oven.
How it breathes. Equipment produces heat continuously, and heat is what shortens the life of every component in the rack. The ventilation path — in low, out high, or forced where the location demands it — is drawn with the joinery, not improvised with a hole saw afterwards. A rack that cooks is a rack that drops out on the hottest evening of the year, which is also the evening the house is full of people.
How much room it has to grow. A house gains systems. A camera at a new gate, a zone in a studio that was a shed, a second access point when the garden gets used properly. A rack designed with space and spare capacity absorbs that in an afternoon. A rack filled to the last unit turns every addition into a rebuild.
Why it is drawn before the cable routes
The order matters, and it is the reverse of how it usually happens.
Draw the rack first and it sets a position. The cable routes radiate from that position. The first-fix paths follow the routes. The device positions sit at the ends of the paths. Everything has a reason, and the reason is on a drawing the electrical contractor can price and the builder can program.
Draw the rack last and the sequence inverts: the devices land wherever is convenient, the cables go wherever they can, and the rack is pushed into whatever space survives. The result is a system that apologises for itself — long cable runs, awkward terminations, a cupboard with the door left ajar so it does not overheat.
The rack elevation is a deliverable of the design and documentation phase for exactly this reason. Sized, ventilated, with the joinery allowance agreed while the cabinet maker is still drawing. It goes out with the device mark-ups and the cable schedules, as one set.
It is built in a factory, not in your house
Once the design is settled, the rack is built at the studio rather than on site. Every device is mounted, cabled, labelled, programmed and run as a complete system on the bench, for days, before it goes anywhere near the home.
This is the stage that does the most for the finished job and gets the least attention. A fault found on a workbench costs an hour. The same fault found on site costs a trade visit, a return booking, and a client standing in their own hallway watching someone kneel in front of a cupboard. Faults are cheap in a workshop and expensive in a finished house, so they get found in the workshop.
It also compresses the part of the programme the builder cares about. A tested rack arrives finished, which turns fit-off into a short, clean visit rather than a fortnight of presence on a site that is trying to reach practical completion.
Labelling is for the people who come later
Every cable is labelled at both ends. Not at the rack end only, which is the common shortcut and the one that wastes an hour every time anyone opens the cupboard.
Patch leads are dressed and sized, not coiled. Spares sit on a hook beside the rack. The as-built documentation, the credentials and the schedules are handed over with the house rather than kept in a drawer at the studio.
The test for all of it is simple. Someone who has never seen this house should be able to open the rack, read it, and work out what everything does. Sometimes that someone is an electrical contractor three years from now. Sometimes it is Baillie's own aftercare team at nine on a Sunday evening, looking at the house remotely while the family is standing in the kitchen.
Which is the point that usually gets missed. Remote support only works on a system that was documented properly. A home that can be read from a distance gets fixed on the call. A home that cannot gets a van, a day, and a conversation about who is paying for it.
What it looks like when it is right
Vertical wire management, so the cabling runs in straight lines and the rack can be opened without disturbing it. Airflow with somewhere to go. Labels at both ends in a consistent scheme. Power conditioning sized for the load. Space left deliberately. A door that closes.
None of this is visible to anyone living in the house, which is rather the point. It shows up as a system that keeps working, that can be added to without drama, and that someone can understand years after the people who built it have moved on.
Designed early, the rack sets the path of every cable in the house.
Draw it first and everything else has a reason. Draw it last and everything else has an excuse.