Specified early, documented properly
Technology is the trade most often left until the drawings are finished, and the one that suffers most for it. Brought in at concept stage, it is drawn into the architecture instead of applied to it โ and the builder prices a scope rather than an assumption.

What you receive
- Device mark-ups on your plans: keypads, screens, speakers, sensors, antennas, cable runs
- Equipment rack elevations, sized and ventilated, with the joinery allowance settled early
- Cable schedules the electrical contractor can work from, labelled both ends
- A written scope detailed enough that tendered prices are comparable
- Our prewire standard, issued on request
What we need, and when
Concept stage
the plans and the brief
Enough to mark up: floor plans, a reflected ceiling plan if it exists, and a conversation about how the home will be used. Early is cheap. Late is not.
Why the studio engages at concept stage, not second fix โ
Design development
finishes and joinery
Keypad and screen locations are a finishes decision as much as a technical one. We work to the interior designer's palette and the cabinet maker's details rather than around them.
Construction
your programme
We work to the builder's dates from rough-in through second fix to commissioning, and we attend the site meetings that matter rather than all of them.
Who does what, at every interface
Every proposal carries a responsibilities matrix, set out by discipline against the five stages where trades meet: Design & documentation, Prewire, Cut-out, Fit-off and Commissioning. Each line names who supplies, who installs, who terminates and who proves it works. A line with no name against it is the line that gets missed on site.
Intelligent lighting panels
Baillie designs and commissions, the electrical contractor prewires, cuts out and fits off.
The switchboard allowance, the panel location and its ventilation are settled at design and documentation, not at second fix.
Ceiling speakers
Baillie documents and commissions, the cable is run at prewire to our schedule.
Baillie cuts out and fits off, so the positions are read off the reflected ceiling plan and the levels are set in the finished room rather than assumed from it.
Automated blinds
Baillie documents and commissions, the builder frames the pocket, the blind contractor fits the hardware.
The pocket, the power and the control cable are drawn before the ceiling is set out. The blinds are commissioned onto the same system as the lighting, so one keypad sets both.
One point of accountability
Lighting control, shade, audio, cinema, network, CCTV, intercom and access come from one studio, on one system, with one contact. The alternative is five subcontractors and an integration problem that becomes the builder's to solve.
Working with us
Projects are taken on in small numbers each year, and the design phase is engaged before tender. If you have a project at concept stage, the studio will come to you.
Plans, a reflected ceiling plan if one exists, and a line about how the home will be used is enough to mark up. The prewire and infrastructure standard is issued on request through the same address.